G) Sides Installation

Moderate · 45 minutes · by Ben Withem · last edited 2022-04-04

Tools

Parts

Step 1 — Install Front

  • Note You may need to loosen the bottom corner cubes and base acrylic panel. This will ensure all mating faces are not under tension.
  • Using (16) M3 x 10 socket head screws and (16) M3 washers attach the front acrylic panel.

Step 2 — Install Right Acrylic

  • Using (16) M3 x 10 socket head screws and (16) M3 washers attach the right acrylic panel.

Step 3 — Install Rear Acrylic

  • Using (16) M3 x 10 socket head screws and (16) M3 washers attach the rear acrylic panel.

Step 4 — Install Left Acrylic

  • Using (16) M3 x 10 socket head screws and (16) M3 washers attach the left acrylic panel.
  • Note Tighten the corner cubes and panels you may have loosened.

Step 5 — Install Feet (x4)

  • Insert (4) M3 x 10 socket head screws and (4) M3 washers into each corner.
  • Thread (4) M3 nuts onto the screws you inserted.
  • Slide the 73 mm 1515 extrusion on the (4) M3 nuts and tighten the socket head screws.
  • Attach the printed foot to the bottom of the extrusion using a M3 x 10 socket head screw.

Step 6 — Complete Side Installation

  • Panel assembly complet.

Originally at https://railcore.dozuki.com/Guide/G)+Sides+Installation/29